Email: inquiry@gpvgroup.cn
Tel: +255 760766084


A well-known enterprise in Tanzania(Hereinafter referred to as the Customer) approached us with a clear objective: to source high-performance coil carrier semi-trailers that combine safety, durability, and cost-efficiency. What began as a single order evolved into a long-term partnership built on precision engineering and unwavering commitment.
Transporting heavy steel coils from port to plant requires equipment that is both robust and economical. Customer needed trailers that could handle demanding conditions while optimizing their total cost of ownership. Initial designs posed logistical challenges, and the customer required a supplier capable of adapting quickly without compromising quality.
At Green Power Vehicle, we focus on creating integrated logistics solutions that align with our clients’ operational and financial goals.
Before production, our engineering team visited Customer’s facility to take detailed measurements and assess operational conditions. This ensured the trailers would integrate seamlessly into their workflow.
| The Quotation of 9 Meters Tri-Axle Flatbed Semi-Trailer | |||
|---|---|---|---|
| For PI No. | 25W-WAC-015GJ | ||
| Semi-trailer Brand | GPV | ||
| Trailer Body | Trailer Size | 8950*2550*2250 | |
| Capacity | 30,000 kg | ||
| Longitudinal Beam | 480 mm | ||
| I-beam | Q345 12/10/16 mm | ||
| Frame | With Frame to fit coil | ||
| Runing Gear | Axle | FUWA 13T*3 | |
| The Suspension System | Mechanical suspension | ||
| Leaf Spring | 90*16-8 pieces | ||
| Tire | 12R22.5 *13 Double Coin 18PR | ||
| Rim | China Brand 9.0-22.5 *13 | ||
| LandingGear | JOST E100 | ||
| Kingpin | JOST 2" bolton type | ||
| Brake system | 2 lines air brake with air tank | ||
| Relay valve | WABCO | ||
| ABS | WITHOUT | ||
| Chamber | T30/30 on rear two axle;T30 on first one axle | ||
| Tool Box | 1000 mm 1 Set | ||
| Oil Tank | WITHOUT | ||
| Spare Tire Rack | 2Set | ||
| Lights | 24V, LED | ||
| Color | White | ||
When the first design proved unsuitable for container shipping, our team revised the specifications to allow efficient containerization—dramatically reducing shipping costs while preserving structural integrity.
All trailers were produced within three weeks and underwent strict quality checks prior to shipment.
Upon receipt, when minor damage was found to some components, we promptly honored our warranty and resolved the issue—reinforcing our promise of reliability.
Upon arrival, we provided the customer with detailed assembly layout drawings and offered continuous guidance on site to ensure a smooth and efficient assembly process.
· Successfully delivered 10 customized coil carriers that fully met load-bearing and operational requirements.
· Achieved significant savings for the customer through redesigned container-compliant trailers.
· Received two repeat orders in 2024 for an additional 16 trailers, bringing the total to 26 units.
· Established a trusted partnership that continues to drive mutual growth.
“We value suppliers who understand our business and respond with agility. GPV Tanzania delivered exactly that—a reliable product and a collaborative partnership.”
— Management Team, Tanzania’s Customer


